Claraturm Basel – Start of Installation

In mid-April 2020, we started installing the curtain wall at our Basel construction site of the Claraturm opposite the trade fair.

The first starter elements are insulated metal panels and were installed at the transition from the ground floor to the first floor at the annex building in Drahtzugstrasse.

Many more unitised Glass-aluminum panels with windows and sheet metal panels will then be installed on the following floors.

Our task in the coming months will be the installation of the annex building as well as the 29-storey tower.

See more News

N