Includes the design, manufacture, supply, delivery and installation of the N8, N9 and N10 External Walling & Cladding Works from level 2 and above.
|
Project
|
“The Project” is Phase 1 of the Nine Elms Square development. The project involves the construction of three residential tower structures (N8, N9 and N10). The towers range from 37 to 53 storeys constructed over a podium and single level basement. “The Project” is Phase 1 of the Nine Elms Square development. The project involves the construction of three residential tower structures (N8, N9 and N10). The towers range from 37 to 53 storeys constructed over a podium and single level basement. |